LG Energy Solution secures 240,000 tonnes of spodumene concentrate from Québec
Elevra says base shipments from its operating Québec mine run across four calendar years. Its filing describes a three-year term starting with the first shipment.

LG Energy Solution and Elevra Lithium announced a binding deal on October 8, 2026, for 240,000 dry metric tonnes of spodumene concentrate from the North American Lithium mine in Québec. LG expects shipments to start later in 2026. Spodumene is the lithium-bearing mineral sold as concentrate under the agreement, and the specified dry weight excludes moisture. The Korean battery manufacturer says the deal expands its North American sources of lithium feedstock for electric vehicle and stationary storage batteries.
Elevra's filing gives a base delivery schedule of 30,000 dry tonnes in 2026, 60,000 in each of 2027 and 2028, and 90,000 in 2029. It calls the deal a three-year agreement measured from the first shipment. LG's announcement describes four years of supply. The disclosed allocations span four calendar years, while the mining company ties the contractual term to the date the first load ships. Neither disclosed an exact initial shipment date.
Elevra can supply up to another 90,000 dry metric tonnes if both parties agree. That potential volume sits outside the 240,000 tonnes in the base commitment. The filing says the price follows the market and is adjusted for the lithium content of the concentrate. It gives no price or contract value. For the mine operator, the agreement brings in a committed customer without fixing the price it receives independently of market movements.
For LG, spodumene adds a different purchasing input alongside lithium carbonate and lithium hydroxide. The concentrate is an intermediate that requires conversion into lithium chemicals before use in batteries. LG did not identify a processor or assign the material to a particular battery plant or cell chemistry. It cited its Windsor, Ontario, battery facility and North American demand for stationary storage as context for developing regional supply.
Elevra describes North American Lithium as an open-pit mine and spodumene concentrator about 60 kilometres north of Val-d’Or, with year-round road and rail access. The first LG shipment is due to come from an operating site. The front end of the agreed schedule is smaller than the 2029 allocation, which accounts for 37.5% of the disclosed base tonnes. That profile matters for purchasers planning conversion capacity or timing chemical deliveries. The filing sets out a commitment for physical concentrate and a calendar-year schedule. It leaves open how much will reach individual vehicle or stationary storage programmes.