Car29Global automotive news

BMW opens Woodruff battery plant to feed US-built electric iX5

BMW Group has started series production of Gen6 high-voltage batteries at its new Plant Woodruff in South Carolina, 15 miles from Plant Spartanburg, where the fully electric iX5 becomes the first BMW EV assembled in the United States.

BMW GROUP OPENS HIGH-VOLTAGE BATTERY ASSEMBLY PLANT IN WOODRUFF
BMW GROUP OPENS HIGH-VOLTAGE BATTERY ASSEMBLY PLANT IN WOODRUFF. Source image.

BMW Group opened Plant Woodruff in South Carolina on 13 November and began series production of sixth-generation high-voltage batteries there. The plant supplies packs for the new BMW iX5 and future electric vehicles at Plant Spartanburg, 15 miles away. BMW called the iX5 its first fully electric model assembled in the United States and said at least six fully electric models will be built at Spartanburg by 2030.

Woodruff is the fourth site in the Gen6 battery network to reach series output, after Debrecen in Hungary, Irlbach-Straßkirchen in Germany and Shenyang in China. Debrecen has produced Gen6 packs since October 2025; the German and Chinese plants began in October 2026. A fifth site, San Luis Potosí in Mexico, is due in 2027. BMW said the network now spans Europe, Asia and North America, a prerequisite for building Neue Klasse EVs on three continents.

The plant assembles packs from cells bought from outside suppliers rather than making cells itself. Cells are integrated directly into the pack on a cell-to-pack basis. The site runs more than 300 employees and around 250 robots, with inline monitoring of every production step and AI tools developed in-house analysing the data. Every pack gets a 100% end-of-line inspection before shipment to Spartanburg.

Construction followed a June 2023 groundbreaking, with building work starting that September. Equipment installation began in September 2024 while construction continued, and first test and pre-series batteries came off the line in summer 2025. BMW said just over three years elapsed from start of construction to series production. Staff trained in a virtual-reality replica of the lines before operating equipment.

BMW said the Gen6 round cells carry more than 20% higher energy density than the previous generation, cut charging times by up to 30% and add 30% range, more in some models. The iX5 cells use a high share of secondary cobalt, lithium and nickel, and renewable energy in anode, cathode and cell production. BMW said CO2e emissions are around 28% lower per watt-hour than the Gen5 cell in the iX.

Woodruff runs without fossil fuels in normal operation, and its industrial trucks are hydrogen-powered. The pack process includes cell clustering with coolers, laser cleaning and precision welding, inline weld-seam inspection, a foaming step for mechanical protection, housing closure and installation of the Energy Master control unit. BMW will launch a long-wheelbase iX3 in China in November, with more Neue Klasse models through 2027.

The local-for-local layout shortens pack logistics to a single 15-mile move, tying battery output directly to Spartanburg's electric X-model line. BMW has not disclosed Woodruff's pack capacity or the iX5's US launch volume. The company's Q3 statement, issued 4 November, guided full-year automotive EBIT margin to minus 0.5% to plus 0.5% after widening restructuring charges.

Sources

How we report